Every number on this sheet was measured against the OEM body and published. No guesswork.
Every diameter, every bend angle, every valve actuation point was tuned on the Z06's flat-plane LT6 — not adapted from another platform. Open the valves and the track soundtrack arrives. Close them and the cruise is civilized enough for the drive home.
Every order ships with hardware, instructions, and a link to the AFD installation video. Most customers install in under two hours.
Watch the install video →Every part QC-checked and serial-tagged before it ships. Verify fitment against the OEM body before drilling anything.
Tape the part in place, walk around the car, eyeball the panel gap. Adjust before committing the adhesive.
Torque to spec sheet, peel the VHB liner, press for 30 seconds per zone. Cure 24 hours before pressure-wash.
Every part follows the same four-step path. Scroll down to watch the build sequence, compressed.